The APIs are flexible and easy-to-use, supporting authentication, user identity, and complex enterprise features like SSO and SCIM provisioning. Learn more →
critical-path-style Open-Source Projects
-
SurveyJS
Open-Source JSON Form Builder to Create Dynamic Forms Right in Your App. With SurveyJS form UI libraries, you can build and style forms in a fully-integrated drag & drop form builder, render them in your JS app, and store form submission data in any backend, inc. PHP, ASP.NET Core, and Node.js.
Project mention: Enhance WASM: Back End Agnostic SSR for Web Components | news.ycombinator.com | 2024-04-11If the link element is placed inside of the shadow DOM, then it's not render blocking and you will experience a flash of unstyled content. That's what the lit docs are referring to.
If you place the link element inside the head of your document, then it is render blocking, which means the browser has to make two round trips to the server if the CSS file isn't in the cache before it render (one to download the HTML file, and then another after it discovers your link element, and has to download the corresponding CSS file).
> The best from both worlds is to embed a lightweight basic CSS stylesheet inline and the rest in cache-able external CSS files.
This is the absolute optimal way of doing it. You would have to analyze your styles to see which styles are applied to elements above the fold, then extract them and put them in an inline style tag. The rest of the styles would have to be downloaded via a link tag, but you'd have to place the link tag at the very end of the HTML body tag to prevent the browser from blocking as soon as it encounters the link element or alternatively use JavaScript to add the link element after the page has been rendered. There are tools to automate this for static sites [1], but doing this for dynamically generated HTML is kind of a pain, and I've found that browsers parse CSS so quickly that the overhead of just inlining it all is very low in many cases.
[1] https://github.com/addyosmani/critical
critical-path-styles related posts
- Critical – Extract and Inline Critical-Path CSS in HTML Pages
- Google Page Speed Insights and Magento 2
- How to Make Your Page Load Faster
- Using Vite with Critical CSS in a way that supports users with JavaScript disabled or unavailable
- 6 Steps to Speed Up WordPress and Improve Google Rankings
-
A note from our sponsor - WorkOS
workos.com | 29 Apr 2024
Index
Project | Stars | |
---|---|---|
1 | critical | 9,957 |
Sponsored