critters
critical-path-css-tools
critters | critical-path-css-tools | |
---|---|---|
7 | 1 | |
3,374 | 1,149 | |
0.4% | - | |
6.6 | 10.0 | |
2 months ago | almost 2 years ago | |
JavaScript | ||
Apache License 2.0 | - |
Stars - the number of stars that a project has on GitHub. Growth - month over month growth in stars.
Activity is a relative number indicating how actively a project is being developed. Recent commits have higher weight than older ones.
For example, an activity of 9.0 indicates that a project is amongst the top 10% of the most actively developed projects that we are tracking.
critters
-
Show HN: Jampack – Optimizes static websites as a post-processing step
I'm interested in the notion of identifying "critical" CSS that should be inlined rather than live in its own stylesheet.
I was hoping there was some principled way of identifying critical and non-critical CSS (e.g. user interaction effects like :hover would always be considered non-critical), but it looks like the library it's using just tries to render your page and do a best-effort detection on which rules are considered critical, which is a little unsatisfying: https://github.com/GoogleChromeLabs/critters
-
Optimize CSS with SAT Solving
https://github.com/GoogleChromeLabs/critters Might be a good starting point. It’s designed to inline the css afterward so it’s more focused on extracting used css than removing unused.
-
Critical CSS and Next.js App Directory
With the Pages dir, we had experimental support for critters. That was good enough for me
-
Remove CSS Styles and Apply Styles to All Elements
Critters does something similar but it is intended to inline only the CSS that is visible upon the page load (top of the page). There is also a Vite plugin that inlines everything that is possible to inline
-
Optimizing CSS Performance in Nuxt with Critters
// nuxt.config.js import { defineNuxtConfig } from 'nuxt' export default defineNuxtConfig({ modules: ['@nuxtjs/critters'], critters: { // Options passed directly to critters: https://github.com/GoogleChromeLabs/critters#critters-2 config: { // Default: 'media' preload: 'swap', }, }, })
-
Critical CSS? Not So Fast
I find critters[0] quite easy to work with and well worth implementing on my nextjs or Astro projects.
I build a lot of landing pages so there are very few multi page visits.
[0] https://github.com/GoogleChromeLabs/critters
-
Vue Webpack - possible to extract some CSS but not all?
Doesn't critters do this already? https://github.com/GoogleChromeLabs/critters I could be wrong though
critical-path-css-tools
-
Critical CSS? Not So Fast
I am a fan of CSSWizardry and yet I find this post misleading. The examples shown are ways NOT to do frontend performance engineering.
The current best performant way to load JS is asynchronously as documented at https://web.dev/efficiently-load-third-party-javascript/.
And the best way to load CSS is with Critical Path CSS + Async CSS as documented at https://web.dev/defer-non-critical-css/.
The easiest way to generate Critical CSS is https://github.com/addyosmani/critical where you may suggest multiple resolutions.
I have found https://github.com/addyosmani/critical-path-css-tools to be a great resource to master critical path CSS which improves page render speeds. It helps build fast rendering sites, sometimes even sub-second renders given you have a low latency backend.
What are some alternatives?
compression-webpack-plugin - Prepare compressed versions of assets to serve them with Content-Encoding
critters - CSS optimization using critters for Nuxt
webpack-assets-manifest - This webpack plugin will generate a JSON file that matches the original filename with the hashed version.
mangle-css-class-webpack-plugin - Minifies and obfuscates the class names in your existing JavaScript, CSS, and HTML without any modern css modules.
critical - Extract & Inline Critical-path CSS in HTML pages
penthouse - Generate critical css for your web pages
webpack-config-plugins - Provide best practices for webpack 4 loader configurations
svg-spritemap-webpack-plugin - SVG spritemap plugin for webpack
styled-system - ⬢ Style props for rapid UI development
goober - 🥜 goober, a less than 1KB 🎉 css-in-js alternative with a familiar API
webpack-static-pages-template - Optimizing static website with Webpack 5